What Is a Construction Change Order? (And What It Should Include)

SiteAnchor Team · Sep 1, 2026

Most small GCs handle change orders on paper, over a text message, or with a handshake — and it's one of the most common ways a job's real profit ends up short of the estimate. A verbal agreement about "extra work" is easy to remember differently once the invoice shows up.

What a change order actually is

A change order is a written amendment to your existing contract. It records a change in scope — something added, removed, or done differently from what was originally agreed — along with what that change costs and what it does to the schedule. Once both parties sign it, it becomes part of the contract, not a side conversation.

What to include on every change order

  • Job and customer — which project and contract this amends.
  • Description of the change — specific enough that neither party could reasonably disagree later about what was agreed to.
  • Cost breakdown — line items, not just a lump sum. A single number invites a dispute over what it covers; an itemized one doesn't.
  • Revised contract total — the original total plus (or minus) this change, shown as math, not just asserted.
  • Schedule impact — a revised completion date if the change adds or removes time, so a delay doesn't quietly become "your fault" later.
  • Signatures — from the contractor and the customer, or it's a draft, not a change order.

Do change orders need to be signed?

Yes, functionally. A change order isn't enforceable until both sides agree to it in writing. A signature — wet-ink or electronic — is what turns "we talked about adding this" into something you can actually bill for and defend if it's ever disputed.

Can you bill for a change order before it's signed?

You can, but it's risky. Without a signed change order, a customer can dispute the added cost after the work is already done, since there's no written record they agreed to the price beforehand. Getting the signature before the work starts — not after — is what the paperwork is for.

Build one in a couple of minutes

We built a free change order form generator that produces a clean, branded, signature-ready PDF from a short form — no account or email required. It's built from the same PDF renderer used inside SiteAnchor, so it's a real sample of what the product produces, not a lookalike.

If you're tracking change orders on paper today, the natural next step is tracking them against your actual job budget automatically instead of doing the math by hand — that's what job costing in SiteAnchor does, and change orders that flow through it update the budget the moment they're approved. See pricing or compare it against other construction software.

What Is a Construction Change Order? (And What It Should Include) — SiteAnchor